Provide SAP C-TS422-2020 Practice Test Engine for Preparation
Detailed New C-TS422-2020 Exam Questions for Concept Clearance
SAP C_TS422_2020 exam is an excellent way for professionals to demonstrate their proficiency in SAP S/4HANA production planning and manufacturing. Passing this certification exam will not only boost the candidate's career prospects but also enhance their knowledge and skills in this domain. If you are looking to establish yourself as an expert in SAP S/4HANA production planning and manufacturing, then this certification is definitely worth considering.
SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing (C_TS422_2020) exam is ideal for those who want to validate their knowledge and skills in SAP's production planning and manufacturing modules. SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing certification is specifically designed for professionals who work with SAP S/4HANA, providing them with the opportunity to demonstrate their expertise in configuring and implementing these modules.
SAP C-TS422-2020 certification exam is a comprehensive exam that covers a wide range of topics related to production planning and manufacturing within an SAP S/4HANA environment. Individuals who successfully pass C-TS422-2020 exam will have the knowledge and skills required to effectively manage production planning and manufacturing processes within an SAP S/4HANA environment. SAP offers a range of training courses and certification resources to help individuals prepare for C-TS422-2020 exam.
NEW QUESTION # 35
What are some uses for the low-level code assigned to each material? Note: There are 2correct answers to this question.
- A. It is used by product costing to determine how costs are rolled up.
- B. It is used in MRP to determine the sequence in which materials are planned.
- C. It is used by engineering to identify sub items in an engineering bill of material(BOM).
- D. It is used by ATP to determine the priority of alternative components.
Answer: A,B
NEW QUESTION # 36
In which of the following master data objects can you define the production order default storage location for a material component? There are 2 correct answers to this question.
- A. Material master of the finished product
- B. Material master of the finished product
- C. BOM, in the item for the material
- D. Work center, in the production supply area
Answer: C,D
NEW QUESTION # 37
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network? Note: There are 3 correct answers to this question.
- A. SAP Ariba
- B. SAP Concur
- C. SAP C/4HANA
- D. SAP SuccessFactors
- E. SAP Field glass
Answer: A,B,E
NEW QUESTION # 38
Which task list types can have parallel sequences? There are 2 correct answers to this question.
- A. Master recipes (2)
- B. Reference operation sets (S)
- C. Routings (N)
- D. Rate routings (R)
Answer: C,D
NEW QUESTION # 39
What capabilities does SAP S/4HANA embedded analytics provide? There are 2 correct answers to this question.
- A. Strategic analysis
- B. Automatic update of story boards
- C. Comparison of current data with historical data to identify trends
- D. Real time decision support
Answer: A,D
NEW QUESTION # 40
Your production planners must execute planning only for specific resources. How can you achieve this in Advanced Planning (PP"/OS)?
- A. Use a propagation range.
- B. Use a heuristic.
- C. Use a planning group.
- D. Use a resource group.
Answer: B
NEW QUESTION # 41
Which of the following processes lead to an entry in the MRP planning file? Note: There are 3 correct answers to this question.
- A. Creation of a sales order
- B. Change of the storage bin
- C. Creation of dependent requirements
- D. Change of the material'sprocurement type
- E. Creation of a purchasing contract
Answer: A,C,D
NEW QUESTION # 42
What is the difference between co-products and by-products?
- A. Only by-products have a zero inventory valuation.
- B. Only co-products are identified by a special item category in the bill of material (BOM).
- C. Onlyco-products can be manufactured in isolation from the main product.
- D. Only co-products appear in the processor production order settlement rule.
Answer: D
NEW QUESTION # 43
What are the possible categories for the Business Partner master data object in SAP S/4HANA?
There are 3 correct answers to this question.
- A. Organization
- B. Customer
- C. Vendor
- D. Person
- E. Group
Answer: A,D,E
NEW QUESTION # 44
Your client is asking for your advice on material master numbering in SAP S/4HANA. What do you need to consider? Note: There are2 correct answers to this question.
- A. The display template for material numbers applies to all clients.
- B. In Customizing you can decide by material type whether to use the long material number.
- C. The number of leading zeros for internal numbers is client-specific.
- D. The maximum mater all number length is 40 for external numbers and 18 for internal numbers.
Answer: A,D
NEW QUESTION # 45
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA.
When can you use mode selection?
- A. When multiple planned orders exists in one resource
- B. When multiple production versions are maintained for one product
- C. When multiple operations are maintained for one product
- D. When alternate resources are used within one operation
Answer: D
NEW QUESTION # 46
For what production type are production orders used?
- A. Replenishment controlled by control cycles
- B. Discrete manufacturing processes
- C. Period and quantity-oriented production
- D. Process manufacturing processes
Answer: B
NEW QUESTION # 47
Which actions does the system perform by default when you save aconfirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.
- A. Material staging for next order in sequence
- B. Reduction of associated capacity requirements
- C. Posting of production costs to the production cost collector
- D. Archiving of documents for assembly scrap
- E. Posting of goods receipt for the product
Answer: B,C,E
NEW QUESTION # 48
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network? Note: There are
3 correct answers to this question.
- A. SAP Ariba
- B. SAP Concur
- C. SAP C/4HANA
- D. SAP SuccessFactors
- E. SAP Field glass
Answer: A,B,E
NEW QUESTION # 49
Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing? Note: There are 2 correct answers to this question.
- A. Run MRP with automatic selection of production version.
- B. Assign planned orders manual lying the planning table.
- C. Run MRP with quotaarrangement.
- D. Run PP/DS heuristics for repetitive manufacturing.
Answer: C,D
NEW QUESTION # 50
How would you define pegging in the context of Advanced Planning?
- A. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements with receipt elements.
- B. An evaluation to verify if there are mater al or capacity shortages in the network after the production planning run.
- C. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run.
- D. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements.
Answer: D
NEW QUESTION # 51
What are drawbacks of the separation of OLTP and OLAP? There are 4 correct answers to this question.
- A. Only the OLAP system has the latest data
- B. The OLAP system needs to write back the data to the OLTP system
- C. Multiple copies of the data exist
- D. Batch process are required to keep OLTP and OLAP in sync
- E. Only the OLAP system has a predefined subset of the data
Answer: B,C,D,E
NEW QUESTION # 52
A resource was created in SAP S/4HANA PP/DS through the internal CIF integration and named "W1904_1000_001". What does the suffix 001 in the resource name represent?
- A. Work center category
- B. Number of individual capacities
- C. Available capacity version
- D. Capacity category
Answer: D
NEW QUESTION # 53
When working with both cross-plant and plant-specific material statuses in the mater al master, which status has the highest priority?
- A. The cross-plant status
- B. The most restrictive status
- C. The least restrictive status
- D. The plant-specific status
Answer: B
NEW QUESTION # 54
An issue storage location was NOT found through the work center, bill of material (BOM)item, or material master. Whatdetermines whether the storage location can be derived from the production version?
- A. MRP Controller
- B. MRP Group
- C. Plant Data
- D. MRP Profile
Answer: B
NEW QUESTION # 55
During planning you are facing an overload situation on a resource. Which activities do you consider to create a feasible production plan? There are 3 correct answers to this question.
- A. Use DS heuristic "Schedule Sequence"
- B. Use optimization with respect to set-up times
- C. Use multilevel MRP run for the products on the resource
- D. Use a bucket-oriented capacity check
- E. Use rescheduling with an alternative mode
Answer: A,B,E
NEW QUESTION # 56
Where can you find the latest in version of the Simplification List for SAP S/4HANA?
Please choose the correct answer.
- A. SAP Best Practices Explorer
- B. SAP Solution Manager 7.2
- C. SAP Help Portal
- D. SAP Support Portal
Answer: C
NEW QUESTION # 57
......