NEW QUESTION 51
You want to produce a finished product only when it is requested by a customer order in make-to-order production. However, all assemblies need to be procured beforehand.
How can you fulfill these requirements in SAP ECC? (Choose two)

  • A. Use strategy 20 (make-to-order production) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.
  • B. Use strategy 40 (planning with final assembly) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.
  • C. Use strategy 30 (production by lots) for the finished product and strategy 70 (planning at the assembly level) for all assemblies in the bill of material.
  • D. Use strategy 50 (planning without final assembly) for the finished product and no strategy for all assemblies in the bill of material.

Answer: A,D

 

NEW QUESTION 52
Which activity can trigger an automatic availability check for the components of a production order?

  • A. Material staging
  • B. Order release
  • C. Goods receipt for a missing part
  • D. Order rescheduling

Answer: B

 

NEW QUESTION 53
During a project phase, your customer raises some questions concerning parameters of the procurement type in the material master in the SAP ECC system.
Which of the following procurement type properties are valid? (Choose two)

  • A. If both procurement types are allowed with entry X (both procurement types), requirements planning assumes in-house production.
  • B. If procurement type E (in-house production) is set, external procurement may still be possible, depending on the material type.
  • C. Procurement types E (in-house production) and F (external procurement) always have to be further refined with special procurement types.
  • D. Procurement types E (in-house production), F (external procurement), or X (both procurement types) can be selected for a material independent of the material type.

Answer: A,B

 

NEW QUESTION 54
Where can you define the default storage location for the material component of a production order? (Choose three)

  • A. Routing
  • B. BOM header (product)
  • C. Material master (component)
  • D. Production version (product)
  • E. Production supply area of a work center

Answer: C,D,E

 

NEW QUESTION 55
What master data do you need for material replenishment using the KANBAN procedure? (Choose two)

  • A. Control cycle
  • B. Production supply area
  • C. Product cost collector
  • D. Production version
  • E. Rate routing

Answer: A,B

 

NEW QUESTION 56
What features related to process orders can be used to fulfill Good Manufacturing Practices (GMP) requirements? (Choose three)

  • A. Resource selection
  • B. Electronic batch record
  • C. Digital signature
  • D. Availability check
  • E. Approved master recipes

Answer: B,C,E

 

NEW QUESTION 57
You have maintained planning strategy group 10 (make-to-stock production) in the material master (SAP ECC) of a material. For the coming months, you have planned requirements with requirement type LSF (derived from main strategy 10). Now, you want to change the requirement type from LSF to VSF (in accordance with planning strategy 40, planning with final assembly) for requirements in the existing production plan.
Which of the following scenarios are applicable in this case? (Choose two)

  • A. You must change the requirement type for planning strategy 10 to VSF in Customizing. The requirement type for all existing requirements is then changed by the next planning run.
  • B. You can change the strategy group from 10 to 40 for the existing production plan in the material master, and the requirement type for all requirements is changed automatically.
  • C. You can enter the strategy group 40 in the material master, but the requirement type is not changed automatically for existing requirements.
  • D. You can enter the strategy group 40 in the material master and change the present requirement for the product manually in the production plan.

Answer: C,D

 

NEW QUESTION 58
What data can be posted directly via the Plant Data Collection (PP-PDC) interface?

  • A. Confirmations
  • B. Goods issues
  • C. Maintenance notifications
  • D. Goods receipts

Answer: A

 

NEW QUESTION 59
Which of the following structural elements does a process order have? (Choose three.)

  • A. Phases
  • B. Relationships
  • C. Characteristic-based process instructions
  • D. Item data
  • E. Parallel sequences

Answer: A,B,C

 

NEW QUESTION 60
The company you advise wants to control the availability check in so that when a production and/or process order is created, the following receipts or issues are taken into account: planned orders, purchase orders, production orders, reservations, dependent requirements. When the production and/or process order is released, only the stock that is currently freely usable should be taken into consideration. How can you fulfill this request?

  • A. Enter an appropriate availability checking group in the material master.
  • B. Differentiated assignment of two different checking rules in check control.
  • C. Activate the freely usable stock in the scope of check.
  • D. Enter an appropriate availability checking rule in the order type.

Answer: B

 

NEW QUESTION 61
Which function is supported by production orders?

  • A. Automatic creation of transfer orders at order release
  • B. Automatic selection of a work center at order release
  • C. Automatic printing of order documents at order creation
  • D. Automatic reading of PP master data at order release

Answer: A

 

NEW QUESTION 62
Which options can you offer someone who uses the SAP ECC system for production orders and requires support for material supply in production? (Choose three.)

  • A. Pull list
  • B. Material directory
  • C. Pick list
  • D. Automatic generation of a transport order
  • E. Logistics Information System (LIS)

Answer: A,C,D

 

NEW QUESTION 63
What do you have to consider when you use SAP ECC long-term planning (LTP)? (Choose two)

  • A. Reorder point planned materials can be included in LTP.
  • B. LTP creates purchase requisitions for external procurement.
  • C. LTP focuses on the operational planning of important components.
  • D. A planning scenario must be released before it can be used in LTP.

Answer: A,D

 

NEW QUESTION 64
Your customer tests the firming options for planned orders in SAP ECC using a test material. Therefore, the customer sets a firming date in the stock/requirements list manually. Additionally, the customer sets a planning time fence with firming type 1 in the material master.
How is the resulting firming interval specified in this scenario?

  • A. By the planning time fence from the material master
  • B. It is predefined in Customizing.
  • C. By the firming mechanism with the longer firming interval
  • D. By the manual firming date

Answer: C

 

NEW QUESTION 65
Which of the following are characteristics of ECC master production scheduling (MPS)? (Choose three)

  • A. The planning of MPS and non-MPS items is always carried out in one planning run.
  • B. MPS items are planned in a standard MRP run.
  • C. MPS items can be defined on plant level.
  • D. MPS items can be defined on MRP area level.
  • E. Non-MPS items can be taken into consideration by an MPS run.

Answer: C,D,E

 

NEW QUESTION 66
Which of the following features are offered by MRP areas in SAP ECC? (Choose two)

  • A. A storage location may be assigned to different MRP areas.
  • B. Make-to-order production is supported by storage location MRP areas.
  • C. Subcontracting is supported by MRP areas.
  • D. An MRP area may include different storage locations.

Answer: C,D

 

NEW QUESTION 67
Which of the following activities within the KANBAN procedure normally triggers subsequent stock posting of the goods receipt?

  • A. Set "Container in process"
  • B. Set "Container in transport"
  • C. Set "Container empty"
  • D. Set "Container full"

Answer: D

 

NEW QUESTION 68
An enterprise wants to use SAP ECC requirements planning together with the NETPL procedure (net change planning in the planning horizon). The planning horizon is to be set equally for all materials by default.
However, some materials are to be given a different planning horizon.
What procedure would you recommend to the project team for setting the planning horizon on the system side?

  • A. The planning horizon is set in the MRP groups in Customizing and variant entries are assigned via the plant parameter settings.
  • B. The planning horizon is set in the plant parameters in Customizing and variant entries are stored in the material masters for the materials in question.
  • C. The planning horizon is set in Customizing using the plant parameter setting and variant entries are assigned via the MRP groups for the materials in question.
  • D. The planning horizon is set in the MRP groups in Customizing and the variant values are stored in the material masters for the materials in question.

Answer: C

 

NEW QUESTION 69
In which of the following objects can you activate backflushing of components if you want to use this functionality during order confirmation? (Choose three.)

  • A. Routing
  • B. Work Center
  • C. Material Master (Finished Product)
  • D. Production Scheduling Profile
  • E. Material Master (Component)

Answer: A,B,E

 

NEW QUESTION 70
What are characteristics of repetitive manufacturing? (Choose three)

  • A. Continuous material consumption, production flow and output
  • B. Shop fabrication
  • C. Automatic line loading based on capacity limits across all production lines
  • D. Period-based planning of the quantities to be produced
  • E. Production without using production orders and without status management

Answer: A,D,E

 

NEW QUESTION 71
Which of the following requirements is supported by using process orders?

  • A. Documentation of the production using an electronic batch record
  • B. Use of reference operation sets
  • C. Use of production/resource tools
  • D. Linkage of documents to orders

Answer: A

 

NEW QUESTION 72
The company you advise wants to carry out the material availability check automatically in the production order at various points in time. Which of the following options would you recommend? (Choose two.)

  • A. Confirmation of the operation that the materials being checked are assigned to
  • B. Creation of the production order
  • C. Goods receipt for the product produced with the order
  • D. Goods receipt for a missing part
  • E. Release of the production order

Answer: B,E

 

NEW QUESTION 73
Your customer does not want to manage value-intensive materials in the warehouse. These materials should be procured directly for the production order.
Which BOM item category must you set to fulfill this requirement?

  • A. E (external procurement)
  • B. N (non-stock item)
  • C. D (document item)
  • D. M (phantom material)

Answer: B

 

NEW QUESTION 74
What do you have to consider regarding lot size procedures?

  • A. If a make-to-order production strategy is used, only the lot-for-lot (exact) lot size can be applied.
  • B. The lot size quantity can be influenced using a minimum lot size and the rounding profile.
  • C. If a long-term lot size is used, procurement is conducted with a long-term perspective.
  • D. The procurement quantity of a lot size procedure can be specified using a safety time period profile.

Answer: B

 

NEW QUESTION 75
......


SAP PP Certification Exam Details:

Exam CodeC_TSCM42_67
Sample QuestionsSAP PP Certification Sample Questions
Exam NameSAP Certified Application Associate – Production Planning & Manufacturing with SAP ERP 6.0 EHP7
LevelAssociate
Reference BooksSCM240,SCM310, SCM300, SCM130, PLM114, TERP50, TERP01,SCM365
Number of Questions80
Duration180 mins
Passing ScoreC_TSCM42_67 - 63%
Schedule ExamSAP Training
Exam Price$550 (USD)

 