Leadership in the IT field starts with proof of skill, and the CMAA Certified Construction Manager (CCM) exam is that proof. In 2026, TestPassed prepares Construction-Manager candidates with 67 practice questions edited by experts who know the real test firsthand.
CMAA Construction-Manager Exam Overview:
| Certification Vendor: | CMAA (Construction Management Association of America) |
|---|---|
| Exam Name: | Certified Construction Manager Examination |
| Exam Number: | CCM |
| Certificate Validity Period: | 3 years |
| Real Exam Qty: | 175 (150 scored, 25 unscored pilot items) |
| Available Languages: | English |
| Passing Score: | 67% |
| Exam Duration: | 240 minutes |
| Exam Price: | $340 (CMAA member) / $440 (non-member) application fee + $290 exam fee |
| Exam Format: | Multiple-choice, Computer-based test (CBT) |
| Related Certifications: | Certified Associate Construction Manager (CACM) |
| Recommended Training: | CCM Build Up Course Professional CM (PCM) Course |
| Exam Registration: | PSI Exam Scheduling Official Application Portal |
| Sample Questions: | ![]() |
| Exam Way: | Online remote proctored or in-person at PSI testing centers |
| Pre Condition: | Minimum 48 months of responsible-in-charge construction management experience; relevant bachelor's degree reduces required experience; references and application documentation required |
| Official Syllabus URL: | https://www.cmaanet.org/certification/ccm |
CMAA Construction-Manager Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Risk Management | 10% | - Monitoring and control - Identification and assessment - Insurance and liability - Mitigation and response planning |
| Contract Administration | 10% | - Contract types and procurement - Claims and dispute resolution - Change order management - Negotiation and formation |
| Sustainability | 5% | - Green building principles - Environmental compliance - Resource efficiency - Lifecycle assessment |
| Safety Management | 10% | - Hazard identification and control - Regulatory compliance - Incident investigation - Safety planning and training |
| Program & Project Management | 20% | - Project initiation and planning - Lifecycle management - Scope management - Stakeholder management |
| Quality Management | 10% | - Compliance and audits - Quality assurance and control - Continuous improvement - Planning and standards |
| Time Management | 10% | - Schedule control - Scheduling techniques - Critical path method - Resource allocation and leveling |
| Professional Practice | 10% | - Leadership and communication - Ethics and standards - Professional development - Legal and regulatory framework |
| Technology | 5% | - Data management and analytics - Emerging technologies - BIM and digital tools - Project management software |
| Cost Management | 10% | - Cost control and forecasting - Financial reporting - Estimation and budgeting - Earned value management |
Construction-Manager Exam: The FAQ Candidates Actually Need
CMAA Certified Construction Manager (CCM) is an official CMAA (Construction Management Association of America) certification exam, listed under the code Construction-Manager. Passing it earns you the Certified Construction Manager (CCM) certification, positioned at the Professional level. It also connects to Certified Associate Construction Manager (CACM). For anyone aiming at a leadership track in IT, this credential is one of the clearest markers of verified skill.
Passing CMAA Certified Construction Manager (CCM) takes 67%, and the official registration fee is $340 (CMAA member) / $440 (non-member) application fee + $290 exam fee. Retakes charge the full $340 (CMAA member) / $440 (non-member) application fee + $290 exam fee again, which is why accuracy in preparation matters more than volume. Validate your readiness with repeated TestPassed practice scores above the requirement before committing to a date.
The CMAA Certified Construction Manager (CCM) exam contains 175 (150 scored, 25 unscored pilot items) questions to answer within 240 minutes. The SOFT engine from TestPassed imitates the real test scene on your computer and uses special methods to help you master questions and answers, so the official time limit becomes a practiced routine rather than a surprise.
Minimum 48 months of responsible-in-charge construction management experience; relevant bachelor's degree reduces required experience; references and application documentation required
Vendor requirements are revised periodically, so confirm the current conditions before registering via the official exam page.
Sign-up for CMAA Certified Construction Manager (CCM) goes through the official channels below.
One planning note: the exam is delivered Online remote proctored or in-person at PSI testing centers.
CMAA (Construction Management Association of America) recommends the following training for CMAA Certified Construction Manager (CCM) candidates.
Reinforce whichever training you pick with the 67 practice questions in the TestPassed Construction-Manager package, edited by experts who follow real test changes firsthand.
Three versions share the same verified content: the PDF prints unlimited copies for paper study, the SOFT engine imitates the real test scene on Windows PCs, and the APP version runs on all electronic products, which is why the majority of examinees choose it. A free demo lets you try before deciding, and after purchase updates are free for 365 days, extendable afterward at a 50% discount.
Worry-free shopping means a 100% money-back guarantee with stated conditions. Take the CMAA Certified Construction Manager (CCM) exam within 60 days of purchase; if you fail, you may claim a full refund, provided the exam matches your product. Attempts within 3 days of purchase are ineligible, as are downloaded-but-unused products, free materials, and expired orders; the candidate name must match the payer name. Submit a scanned enrollment slip and the official Score Report PDF within 2 days of the exam, and claims are processed within 7 days. Alternatively, exchange for two other exam products of equal value, free, keeping the update service on your original purchase.
Delivery is immediate: files unlock for download at payment and are emailed to you within one minute. If nothing arrives within 2 hours, check spam and contact our 7/24 customer attendants, who reply within two hours. Installation is unlimited, and credit card payment keeps your money safe.
CMAA Certified Construction Manager (CCM) is structured into 10 official domains. The leading ones are Technology (5%), Contract Administration (10%), and Quality Management (10%). The full topic breakdown appears above; accurate preparation starts with an accurate map.
CMAA Certified Construction Manager (CCM) Sample Questions:
At what stage of the design phase shall the CM conduct a constructability review?
- A. Throughout the design process including 100% design documents
- B. 60% design stage
- C. 30% design stage
- D. 90% design stage
Correct Answer: A 🗳️
Explanation: Only visible for TestPassed members. You can sign-up / login (it's free).
What are the essential components of the Risk Management process?
- A. Communicating and reporting, assessing, mitigation, tracking
- B. Avoiding, tracking, mitigation, transferring
- C. Avoiding, mitigating, transferring, accepting
- D. Communicating and reporting, tracking, mitigation, resolution
Correct Answer: C 🗳️
Explanation: Only visible for TestPassed members. You can sign-up / login (it's free).
During the design phase of a CM agency project, the designer submits several design options for the stakeholders to review and provide input on. Whose responsibility is it to ensure that the stakeholders are able to provide input on the designs?
- A. Designer
- B. Owner
- C. CM
- D. Commissioning agent
Correct Answer: C 🗳️
Explanation: Only visible for TestPassed members. You can sign-up / login (it's free).
Industry best practice is to conduct a pre-bid conference. The intent of the pre-bid conference is to
- A. survey existing conditions and reveal unforeseen conditions.
- B. limit the number of bidders on the project.
- C. resolve any questions about contract requirements and scope of work.
- D. mitigate change orders and delays.
Correct Answer: C 🗳️
Explanation: Only visible for TestPassed members. You can sign-up / login (it's free).
A construction manager is responsible for the bid review and evaluation of an $85 million high school project.
All bids must be submitted in person at the client's Purchasing Office by 1:00 PM EST and stamped by the CM's team. While preparing for the bid opening, the CM noticed that one of the contractor's bids was submitted a day earlier to a new clerk, but was date and time stamped after the bids were due. What should the CM do in this situation?
- A. Send the bid back to the contractor and apologize for the mishap.
- B. Include the unopened bid. since it clearly was an oversight.
- C. Put the contractor's unopened bid in tight security until the bid opening has been completed.
- D. Inform the Owner and review the instructions to bidders for guidance on how to proceed.
Correct Answer: D 🗳️
Explanation: Only visible for TestPassed members. You can sign-up / login (it's free).



